Frequently Asked Questions

The developer is Sutton Harbour Group plc. through its wholly owned subsidiary Harbour Arch Quay Limited.   Sutton Harbour is leading the building itself, contracting directly with the trades.  Construction management is performed by Moore Manage.  Click here to view the full team.

14 apartments over eight floors.

There are six 2-bed apartments and and eight 3-bed apartments.

There is a 999 year lease.

Estimated between £1,800 – £3,000 per annum depending on the apartment size.

There will be a peppercorn ground rent.

There is a 10 Year Building Guarantee with Premier Guarantee.

6 weeks from receipt of contract.

£2000.  Fifty percent is refundable as per the consumer code.

The estimated practical completion date is Q1 2023.

There is one space allocated to each apartment.  Arrangements for additional parking are available.

Non flammable materials are being used.

The apartments have individual boilers within the utility cupboards.

Engineered oak to living and hallway, tiled to bathroom and en-suite, carpet to bedrooms.

Mayflower kitchens is the supplier.  The buyer will be able to choose from a wide selection of colours and worktops.

Supplied by Mayflower Bathrooms.

AEG/Electrolux or similar.

Induction Hob, Oven, Dishwasher, Washer/dryer, fridge/freezer.  Refer to our detailed specification here.

Scroll to Top